09/04/2024
Bedroom fully decorated after it had been completely plastered,
Applied a miss-coat to the ceiling and walls, applied a base coat to the walls prior to applying the colour, applied 3 coats of matt brilliant white to the ceiling, applied two coats of colour to the walls, removed the carpet, underlay and grippers before laying the laminate flooring, fitted the skirting board and sanded all of the woodwork, applied 3 coats of white satin wood finish to all of the wood work, applied the wall paper to the feature wall, installed new plug sockets and light switch, assembled the double wardrobe complete with assembling the sliding wardrobe doors and to complete the project I installed the floating shelves, curtain pole, clock and other accessories.