30/07/2026
Recently just laid a porcelain tile patio. Previously the patio dropped off massively. Clients removed everything, I dug out and put down the sub base and then cracked in with the tiling.
Primed each slab. In total there was 45 tiles to lay. Had to form a step and a mini slop by the gate to marry in with the existing concrete path and then put a fillet around the sides to marry in where the levels were quite bad.
Resin jointed as well and looking lovely. Looks a little messy as I kept traipsing dust on them but it looks cracking ๐๐ป