Paul Butler Construction LTD

Paul Butler Construction LTD Building ,construction and groundwork contractors

150m2 new resin bound driveway installed, Excavation , base prepEdgings installed, drainage , porous concrete and resin ...
02/04/2026

150m2 new resin bound driveway installed,
Excavation , base prep
Edgings installed, drainage , porous concrete and resin bound top installed,

Top job 👌👌

Another site cleared and land /storm drainage installation underway
24/02/2026

Another site cleared and land /storm drainage installation underway

More muck to shift and site clearance underway 2026
24/02/2026

More muck to shift and site clearance underway 2026

Large muck shift , earthworks , levelling and soiling inc refurbishing of trackway underway and coming along nicely 👌👌
18/12/2025

Large muck shift , earthworks , levelling and soiling inc refurbishing of trackway underway and coming along nicely 👌👌

New two bed house coming along nicely 👌
07/09/2025

New two bed house coming along nicely 👌

Last brick in the wall , lovely bit of Flemish bond brickwork my favourite 👌👌
07/09/2025

Last brick in the wall , lovely bit of Flemish bond brickwork my favourite 👌👌

Early this year we carried out a renovation on a beautiful old farm house and re designed the upstairs some photos from ...
07/09/2025

Early this year we carried out a renovation on a beautiful old farm house and re designed the upstairs some photos from start to completion 👍👍

Nice feature fire place built for one of my favourite customers 👌👌
07/09/2025

Nice feature fire place built for one of my favourite customers 👌👌

For all you earthworks , reduce digs , bulk excavation and hard landscaping inc all weather paddocks, riding arenas and ...
06/04/2025

For all you earthworks , reduce digs , bulk excavation and hard landscaping inc all weather paddocks, riding arenas and much more
Contact us 07885 055039

Total first floor rip out and reconfiguration of rooms creating a beautiful bathroom, cloakroom, dressing room , bedroom...
06/04/2025

Total first floor rip out and reconfiguration of rooms creating a beautiful bathroom, cloakroom, dressing room , bedroom , laundry room and walk in wardrobe

Full refurb inc full decoration 👌

More photos to follow on completion, coming soon 😁👍👍

2 bed newbuild under way , more photos to follow 👍👍
01/04/2025

2 bed newbuild under way , more photos to follow 👍👍

Address

Basingstoke
RG265EN

Website

Alerts

Be the first to know and let us send you an email when Paul Butler Construction LTD posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share