29/03/2026
Have to say this was one off the hardest jobs ive did in along time.
Concrete was between 14/20in thick in places. And the water pipes for the oil boiler to the house weren't even an inch under ground. And i went right through them with the saw. Took alot longer than i was planning on but we got there in the end.
5 new manhole covers.
Madsion paving with 100x100x50mm charcoal border.
Another happy customer.