23/04/2026
What a transformation…..
We’ve been in Holme on Spalding Moor this week , creating a dream bathroom for a lovely couple. They recently moved into the bungalow and made the decision to upgrade the bathroom first. After a lot of planning the old bathroom was stripped out , tiles off , floors up and pipe work went in to allow us to relocate the basin , toilet, and radiator. The walls have been skimmed , then decorated in a heritage green and finished with a stunning oak look board.
New flooring installed then the anthracite units with toilet and basin went in, a heated towel rail has been fitted that has the option to run on the homes central heating system or a switch . The bath was installed and we made the bath panel from the waste wall board , this gave a far superior finish than the “standard” white plastic panels usually supplied.
A lovely LED back lit mirror finished the room perfectly.
Can we help you transform any part of your home ?