21/10/2025
ISE were at a well known Spa resort over the Summer, repairing a damaged outdoor three phase supply and upgrading it from 100A to 200A for potential future expansion. We also installed Fibre Optic cabling and equipment for high speed WiFi. Avoiding 11kV, 400V, Fibre, LPG, Drainage and Water within the ground, the route wasn't easy, but a success nonetheless!
Engineer: Team Effort
Client: Ragdale Hall and Spa
Contact us on 01949 843253 or [email protected]