26/09/2022
Another Job Completed Today ππ» - Existing floor taken up and re-levelled / opening made between kitchen and dining room with bi-fold doors fitted / LVT flooring with underfloor heating installed / new kitchen installed / 3 new internal doors / oak flooring fitted throughout hallway / new electrics and plumbing throughout / back door replaced and fully decorated.