FPV Plumbing & Maintenance

FPV Plumbing & Maintenance Bathroom fitting . Full house renovation . Electrical work
(1)

Small job this week in easingwold -bath out and shower tray fitted -walls under the bath to sort -wet wall panels to be ...
24/08/2026

Small job this week in easingwold

-bath out and shower tray fitted

-walls under the bath to sort

-wet wall panels to be fitted

- a few tiles on the floor to cover the gaps , or maybe lino fitted .

Bathroom in huby North Yorkshire .Not a lot could be change on this bathroom , size was always against us . All new prod...
18/08/2026

Bathroom in huby North Yorkshire .

Not a lot could be change on this bathroom , size was always against us . All new products and pipework , walls insulated as single brick. Underfloor heating new oil filled towel warmer .underfloor heating ,all plastering work by GT plastering of Easingwold , need to pop back and change the toilet flush for a brushed brass and the overflow disc to brushed brass when delivered .

Bathroom Huby - full rip out - wall insulated as single brick - new shower - brushed bronze products - new soil pipe fit...
25/07/2026

Bathroom Huby

- full rip out
- wall insulated as single brick
- new shower
- brushed bronze products
- new soil pipe fitted
- underfloor heating
- panelling on the walls

Shower room fitted in sessay -full rip out - all new products fitted - bigger shower fitted -tiled floor and shower area
25/07/2026

Shower room fitted in sessay

-full rip out
- all new products fitted
- bigger shower fitted
-tiled floor and shower area

Customer to finish off the painting .
09/06/2026

Customer to finish off the painting .

Bathroom in easingwold. -full rip out - shower going in the old cylinder cupboard - new suite -Tiling back wall- traditi...
07/05/2026

Bathroom in easingwold.

-full rip out
- shower going in the old cylinder cupboard
- new suite
-Tiling back wall
- traditional style towel rail
- new flooring

Bathroom for July  Huby North Yorkshire - needs all walls and ceiling insulated - underfloor heating - new suite fitting...
02/04/2026

Bathroom for July Huby North Yorkshire

- needs all walls and ceiling insulated
- underfloor heating
- new suite fitting
- down lights
- all walls and ceiling plastered
- customer to supply there own flooring ( we will fit )

Simple bathroom  done in brandsby . Part of a new extension .
26/03/2026

Simple bathroom done in brandsby . Part of a new extension .

Bathroom booked in for May - full rip out - fully plastered - shower being fitted into cupboard space and door. Blocking...
14/03/2026

Bathroom booked in for May

- full rip out
- fully plastered
- shower being fitted into cupboard space and door. Blocking up
- new sink and toilet
- traditional style towel rail
-tile re wall
- luxury Lino to be fitted

Bathroom to start in April -full rip out - window being made smaller so shower can be fitted -fully re plastered - showe...
14/03/2026

Bathroom to start in April

-full rip out
- window being made smaller so shower can be fitted
-fully re plastered
- shower tray
- down lights
-LVT flooring
-vanity unit

Customer supplying there own bathroom products

Address

Brandsby

Telephone

+447516767884

Website

Alerts

Be the first to know and let us send you an email when FPV Plumbing & Maintenance posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to FPV Plumbing & Maintenance:

Shortcuts

Share