04/09/2026
🏡 Completed Project | Warminster Station
MLG UK Ltd carried out roofing works at Warminster Station following reports of water leaks within the café.
The works included repairing and waterproofing the existing roof using the Polyroof Protec liquid system, alongside replacing the existing guttering with new heritage-style aluminium guttering to improve drainage and complement the listed building.
The completed works have provided the café with a durable, long-lasting roof and improved rainwater management.