21/08/2026
How it started and 4.5m3 should have been all in within an hour ‘easy peasy’ but turned into a nightmare! Line Pump down so send in the 42m Boom Pump bingo even easier but then strike F**king Flash Concrete, soon as started to pour, 2nd time in 15yrs but of all days today. Pump boom almost blocked as it rapid cured and downhill from there trying to level curing concrete, breakout job on the hopper at the end.