PlumbTec

PlumbTec Plumbing, Heating and Gas engineers. We specialise in low carbon, green energy solutions from Air Source Heat Pumps & Solar Hot water to Under Floor Heating.

If you're looking the latest heating technology, speak to us today

Variotherm VarioComp modular overlay underfloor heating
20/02/2023

Variotherm VarioComp modular overlay underfloor heating

130m2 of UFH laid and screeded this week. Pex-al-pex pipe at 100mm centres finished with 40mm thermio liquid screed     ...
15/02/2023

130m2 of UFH laid and screeded this week. Pex-al-pex pipe at 100mm centres finished with 40mm thermio liquid screed

9kw Panasonic T-Cap unit providing heating and hot water. Combined with a 300L  heat pump cylinder and  pumps running th...
31/01/2023

9kw Panasonic T-Cap unit providing heating and hot water. Combined with a 300L heat pump cylinder and pumps running the UFH and radiators

Retrofit installations usually pose a problem when it comes to space. This property had a gas combi boiler with no hot w...
01/12/2022

Retrofit installations usually pose a problem when it comes to space. This property had a gas combi boiler with no hot water storage. We managed to house all of the major components for the heat pump system within the under stairs cupboard. UFH downstairs and correctly sized rads upstairs will make for a very efficient system

Progress being made on our latest Stiebel Eltron installation on an amazing new build project in Cheshire
03/10/2022

Progress being made on our latest Stiebel Eltron installation on an amazing new build project in Cheshire

Day one of a project we have been planning for the past few months. First step it removal of the existing pair of 11kw s...
09/08/2022

Day one of a project we have been planning for the past few months. First step it removal of the existing pair of 11kw split heat pumps. These were badly installed leading to poor efficiency and big running costs. The photos should give an indication of the standard of the original installation

Underfloor heating going down on a large new build project we are currently working on. 100mm pipe centres to make sure ...
08/07/2022

Underfloor heating going down on a large new build project we are currently working on. 100mm pipe centres to make sure we can keep the flow temperatures as low as possible and achieve the best efficiency from the heat pump. I’ll try to update on this build as it progresses

Here’s one of our latest ASHP installations. This system has been sized to heat a very large domestic property with a 16...
10/04/2022

Here’s one of our latest ASHP installations. This system has been sized to heat a very large domestic property with a 16kw power requirement at -4°c. The refrigerant split Alfea unit was chosen due to performance and the siting requirements of the outdoor unit. The refrigerant split system enabled us to locate the outdoor units discreetly away from the house and patio area. The two indoor units are connected to a 200L buffer vessel suppling 350m2 of UFH

Here’s one of our latest ASHP installations. This system has been sized to heat a very large domestic property with a 16...
10/04/2022

Here’s one of our latest ASHP installations. This system has been sized to heat a very large domestic property with a 16kw power requirement at -4°c. The refrigerant split Alfea unit was chosen due to performance and the siting requirements of the outdoor unit. The refrigerant split system enabled us to locate the outdoor units discreetly away from the house and patio area. The two indoor units are connected to a 200L buffer vessel suppling 350m2 of UFH

This GSHP installation was recently completed by Plumbtec. The project was a 120 year old house currently heated by an a...
22/02/2022

This GSHP installation was recently completed by Plumbtec. The project was a 120 year old house currently heated by an anthracite boiler. The central heating radiators and pipework had to be replaced to achieve the best performance from the new low temp heat pump. We opted to install 2 x STIEBEL ELTRON 13kw ground source units combined with a 400 Litre buffer and 300 Litre hot water cylinder. The ground collector is a horizontal ground loop with 8 x 120m loops totalling 960m of collector buried at 1.2m

Our latest low temperature heat pump installation commissioned today. The homeowner had been heating their home and hot ...
21/10/2021

Our latest low temperature heat pump installation commissioned today. The homeowner had been heating their home and hot water with and lpg combi boiler for the past 7 years. They needed to reduce their energy bills and improve the system efficiency Designed with energy efficiency at the core, the system we specified will have a max flow temp of 45°c at -3°c. Currently running around 34°c on this fresh Autumn day. We opted for the 9kw low temp monoblock for this protect as it was a perfect match for the load requirements and temperature required to meet our design. All internal and external primary pipework insulated with to ensure the system performs to its best. Thanks to and for suppling the kit

Address

21 Purbeck Drive
Bury
BL81JG

Opening Hours

Monday 8am - 8pm
Tuesday 8am - 8pm
Wednesday 8am - 8pm
Thursday 8am - 8pm
Friday 8am - 8pm
Saturday 8am - 6pm
Sunday 8am - 6pm

Telephone

+441617610157

Alerts

Be the first to know and let us send you an email when PlumbTec posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to PlumbTec:

Share