31/05/2026
Popped out a little earlier today to replace a faulty 3 phase, 4 wire 400 volt KWH submain meter. Over time and the years the cables had become a little stiffer and I really didn’t like how they were pressed against the sharp edges of the hole saw holes but I managed to squeeze in some grommet strip to stop them cutting through the insulation. Phase rotation checked before and after just to make sure that all the motors would still be turning in the right direction after it’s powered back up.