05/02/2026
Our latest bathroom/utility room completed yesterday in Penarth and a return to a previous client. We completed Nia's main bathroom back in 2023.
Due to an ingress of water from the outer wall and a garden wall that was way to close to the property, we dug back and built a new retaining wall, installed new eco drains and re-rendered.
There were many leaks in the downstairs bathroom so we had to take it back to the bare bones, damp proofing, re-boarding and plastering. Nia wanted a utility room aswell so we completely reconfigured the layout, utilising the space to incorporate a belfast sink along side the washing machine. Cardiff Granite custom made the granite work top that sits on top (and matches the new kitchen work tops).