22/08/2026
Tough week this one was. It was very hot and we had an oil tank and boiler to remove. Down a very steep path and steps. 6 radiator upgrades and some primary pipework upgrades to allow for flow. Most of the house was on 10mm copper. But checking the load to each circuit proved that we didn't need to upgrade them. That's the whole point in doing the maths. Makes the £9000 voucher go as far as possible to the system upgrade, minimise disruption to the customer and property, maximise performance and system efficency.
A wall mounted Grant heat pump r290. Primary Pro used for external pipework. Cylinder was fitted under the stairs where the oil boiler was previously, so no room lost.
Grant UK Professional Primary Pro Nigel Davies