After removing the floor tiles for MGP Kitchens & Joinery on thursday I found the previous toilet area as shown had been patched in with a layer of concrete 30mm higher than the rest of the property. Most of the time asphalt is used as a dpm for the property, this had obviously been removed, so yesterday the concrete was smashed out (nearly hitting a buried water pipe), sanded smooth, epoxy dpm installed and grip primed, then this morning levelled up to the existing asphalt surface using flex and fibre, all products used from