AMP Electrics

AMP Electrics Expert Electricians in Essex
NICEIC Approved Contractor
Networking, Wifi, Pro Audio & Cinema
Rako Li No jobs too big or small. Contact us for details

Commercial & domestic electrics
Plumbing
Building
Maintenance
Smart home technology

Covering London and the whole of the South East. Long & short term property maintenance contacts available.

Always nice when you get a happy customer.It makes work all the more worth while , and no I didn’t pay him to write this...
27/02/2020

Always nice when you get a happy customer.
It makes work all the more worth while , and no I didn’t pay him to write this review lol

No rest for the wicked. Someone put a 360 excavator bucket through a sub main, so we’re out here repairing it. Oh, and i...
17/02/2020

No rest for the wicked. Someone put a 360 excavator bucket through a sub main, so we’re out here repairing it. Oh, and it’s freezing.

Poorly installed outside lighting. This is not how you install a Wiska box. One of many reasons this circuit was trippin...
05/02/2020

Poorly installed outside lighting. This is not how you install a Wiska box. One of many reasons this circuit was tripping.

Little fit out for a garden studio. With low ceilings, a small space between ceiling and roof and good quality lights re...
09/11/2018

Little fit out for a garden studio. With low ceilings, a small space between ceiling and roof and good quality lights required we opted for 135mm low profile downlights. 9w each and with a high CRI so the customer can work on jewellery and photography.
We fitted a new ring main, 6 downlights and an intelligent radiator with Bluetooth control to keep it nice and toasty in the coming months.

Customer wanted 2 lots of spotlights changed for down lighters before they have a new kitchen installed.  Downlights fit...
08/11/2018

Customer wanted 2 lots of spotlights changed for down lighters before they have a new kitchen installed. Downlights fitted and holes filled ready for the customer to paint.

Itchy itchy
08/11/2018

Itchy itchy

The previous builder of the extension decided to pack up the steel with a bit of plasterboard. Terrible work. Any water ...
19/10/2018

The previous builder of the extension decided to pack up the steel with a bit of plasterboard. Terrible work. Any water leak and the steel would move. Good job the current builders decided to take a look.

This is why you need a rewire! 2.5mm T&E extended to the socket using a bit of 1mm.
19/10/2018

This is why you need a rewire! 2.5mm T&E extended to the socket using a bit of 1mm.

First bits of the audio system going in today.
26/09/2018

First bits of the audio system going in today.

Address

Clacton-on-Sea

Alerts

Be the first to know and let us send you an email when AMP Electrics posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category