East Devon Digger Services

East Devon Digger Services Digger hire with operator covering all of East Devon and Mid Devon.

We needed the 13 ton excavator this week for moving approximately 1500 cubic metres of soil, extending the yard and trac...
06/06/2023

We needed the 13 ton excavator this week for moving approximately 1500 cubic metres of soil, extending the yard and tracks for a farm. Get in touch for a quote, no job too big or small.

A busy 5 days crushing blocks from an old barn and the concrete floor, all of the crushed concrete was recycled and used...
03/06/2023

A busy 5 days crushing blocks from an old barn and the concrete floor, all of the crushed concrete was recycled and used to extend farm tracks.

370m long x 1m deep trench excavated for National Grid to install new cables.
17/03/2023

370m long x 1m deep trench excavated for National Grid to install new cables.

New porcelain paving being installed, the customer was after a different look and opted for white gravel in between the ...
11/03/2023

New porcelain paving being installed, the customer was after a different look and opted for white gravel in between the paving joints. The paving has been raised upto the height of the floor internally for a flush finish. Aluminium aco drains have been installed all around the house to prevent any damp problems, and the bi-fold doors have the appropriate drainage installed underneath to take away any rain water.

120sqm area being prepped with top soil and turfed.
11/03/2023

120sqm area being prepped with top soil and turfed.

A new 80m driveway being completed and joining onto the existing one, all of the soil has been banked either side to be ...
11/03/2023

A new 80m driveway being completed and joining onto the existing one, all of the soil has been banked either side to be seeded for grass and wild flowers. Built up with geotextile membrane, 200mm of MOT type 3 rolled and compacted, 20mm gravel, all to be compliant with SUDS requirements.

Recent job completed. 2m deep footings for a 9m x 8m garage, and then 40 tons of type 1 compacted in 100mm layers for th...
11/03/2023

Recent job completed. 2m deep footings for a 9m x 8m garage, and then 40 tons of type 1 compacted in 100mm layers for the garage sub base.

Address

Kerswell
Cullompton
EX152EH

Website

Alerts

Be the first to know and let us send you an email when East Devon Digger Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share