Good week last week to dust ourselves down after a lovely break .
Multiple jobs at a factory we look after (all outside jobsπ₯Ά)
This one on show here is a 50a supply which weβd wired last year, 100m run from panel board. We just had to return now the huts built to connect in, wire 4 non corrosive light fitting, test and leave in good working order
Other jobs we carried out included a 40a supply to an outbuilding, we had to use some ground working skills in order to take up the block paving, dig trench and wire cable to cabin. We fitted new consumer unit and made sure sufficient lighting power and heating were in good working order
Other jobs included upgrading some 70w floods to some 300w monsters. Taking the light output from 8000 lumens to a whopping 44000 lumens per light. We re instated the 70w floods lower down however to save them going to waste to maximise the light on the car park in these dark months.