22/03/2026
Recently went back to do some finishing touches inside on this roof conversion project including boxing in services, sealing the exposed flint walls and adding shelving to break up the transition from tiles/ plaster to the exposed feature walls. Happily worked alongside Neil J Burrell Roofing and Property Maintenance on this of project of theirs, which involved removing the existing ceilings in both rooms, reframing the existing roof structure to accommodate the new velux windows, fully insulating between the rafters and beneath them with a 25mm service gap for cables to be re-routed and tidied up from the existing loft space, as well as rodent protection and ventilation added before a full reroof including new lead apron flashings, then handed over to the plasterers for skimming before our return to add those little finishing details 👌.
Customers are chuffed with the end result and so are we! Get in touch if you have any similar project ideas that may require a bit more than just a reroof!