MM Brickwork Ltd

MM Brickwork Ltd A local family run business which aims to put a smile on there customers face πŸ˜€

MM Brickwork Ltd is a local, family-run bricklaying and construction business committed to delivering high-quality craftsmanship that leaves every customer satisfied.

Boom babyyyyy new van all sign writtened up ready for work πŸ₯³πŸ₯³πŸ₯³ massive thanks to  chip. Fantastic job as always πŸ‘ πŸ‘ πŸ‘Œ
26/08/2026

Boom babyyyyy new van all sign writtened up ready for work πŸ₯³πŸ₯³πŸ₯³ massive thanks to chip. Fantastic job as always πŸ‘ πŸ‘ πŸ‘Œ

Job no 43The existing opening between the house and conservatory was carefully enlarged to create a much wider, open-pla...
14/08/2026

Job no 43

The existing opening between the house and conservatory was carefully enlarged to create a much wider, open-plan living space. The work involved the safe removal of the existing masonry, installation of a new structural steel beam with appropriate end bearings, and temporary support throughout to maintain the integrity of the property. Once the steel was securely in place, the opening was made good, providing a strong, compliant structure and a seamless transition between the two rooms. The finished result significantly improves the flow of natural light and creates a spacious, modern open-plan area ready for the final finishing works.

Job location Wymondham Norfolk

Wymondham Windows

Job no 42 We constructed this conservatory base from foundation level through to the completed concrete slab, ensuring a...
13/08/2026

Job no 42

We constructed this conservatory base from foundation level through to the completed concrete slab, ensuring all work was carried out to a high standard and in line with the required specifications. The blockwork perimeter walls were built accurately and tied into the existing structure, providing a solid and level base ready for the conservatory installation. The reinforced concrete floor slab was poured and finished with a smooth, level surface, leaving the project clean, structurally sound, and fully prepared for the next stage of construction.

Job location Kings Lynn Norfolk

Job no 41We completed the construction of this new porch base, creating a strong and accurate foundation ready for the i...
07/08/2026

Job no 41

We completed the construction of this new porch base, creating a strong and accurate foundation ready for the installation of the new porch. The project included setting out the footprint, constructing the brickwork to DPC level with neat, consistent jointing, and ensuring the structure tied seamlessly into the existing property. Built with durability and precision in mind, the porch base provides a solid, level platform that is fully prepared for the next phase of construction while enhancing the property's entrance.

Job location Bury St Edmunds Suffolk

Job no 40We completed the construction of this new porch base up to DPC level, providing a solid and accurate foundation...
07/08/2026

Job no 40

We completed the construction of this new porch base up to DPC level, providing a solid and accurate foundation ready for the next stage of the build. The works included preparing and pouring the reinforced concrete slab, setting out the footprint, and building the brickwork to damp proof course with neat, level finishes throughout. The base was formed to tie in seamlessly with the existing property, creating a strong, durable and well-finished platform ready for the porch superstructure.

Job location Snettisham Norfolk

Job 39We recently completed the construction of this concrete access ramp, providing safe, durable and wheelchair-friend...
07/08/2026

Job 39

We recently completed the construction of this concrete access ramp, providing safe, durable and wheelchair-friendly access to the property. The project included a reinforced concrete ramp with the correct gradient, integrated drainage to prevent surface water build-up, and high-quality galvanised handrails fitted on both sides for added safety and support. Red brick edging was installed to create a neat, professional finish that complements the existing property, resulting in a practical, low-maintenance access solution built to a high standard.

Job location Mildenhall Suffolk

Job No 38A small window brick up done this morning for the lads at Essex & Suffolk Windows Doors & Conservatories Job lo...
04/08/2026

Job No 38

A small window brick up done this morning for the lads at Essex & Suffolk Windows Doors & Conservatories

Job location Manningtree Essex

Job no 37 We completed the construction of this concrete pad up to DPC level, providing a strong, level, and durable fou...
29/07/2026

Job no 37

We completed the construction of this concrete pad up to DPC level, providing a strong, level, and durable foundation ready for the next stage of the build. The work included accurate setting out, excavation, installation of a damp-proof membrane, and pouring and finishing the concrete to achieve a high-quality finish. Care was taken throughout to ensure the pad was built to the correct levels and dimensions, creating a solid base that meets building standards and is prepared for the superstructure to be constructed.

Job location Methwold Norfolk

Job No 36 We recently completed this concrete access ramp, creating a safe, durable, and fully accessible entrance to th...
23/07/2026

Job No 36

We recently completed this concrete access ramp, creating a safe, durable, and fully accessible entrance to the property. The ramp was carefully set out, formed, and poured to achieve a smooth, even finish with the correct gradient for easy access. We also installed galvanised steel handrails to provide long-lasting safety, support, and compliance with accessibility requirements. The finished ramp is built to a high standard, offering a practical, low-maintenance solution that complements the property while improving accessibility for all users.

Job location Mildenhall Suffolk

Job no 35 Base up to DPC Completed: The base up to damp-proof course (DPC) level has now been successfully completed. Th...
16/07/2026

Job no 35

Base up to DPC Completed: The base up to damp-proof course (DPC) level has now been successfully completed. The area was excavated, prepared, and compacted before installing the required membrane and reinforcement where necessary. Concrete has been poured, levelled, and finished to provide a solid, even foundation ready for the next stage of construction. The work has been completed to the required level and is now curing before further building works commence.

Job location Dereham Norfolk

Address

Store Street
Diss
IP224ED

Opening Hours

Monday 8am - 5:30pm
Tuesday 8am - 5:30pm
Wednesday 8am - 5:30pm
Thursday 8am - 5:30pm
Friday 8am - 5:30pm
Saturday 8am - 5:30pm

Telephone

+447568704569

Alerts

Be the first to know and let us send you an email when MM Brickwork Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to MM Brickwork Ltd:

Shortcuts

Share