🔥 Another project completed by First Rate Brickwork 🔥
This job was completed during one of the hottest weeks of the year! We were brought in to carry out the brickwork and structural preparation ready for a new roof and bi-fold doors.
Our work included:
✅ Removing the existing roof.
✅ Removing the existing windows and doors.
✅ Removing the old window and door lintels.
✅ Raising the ceiling height by 150mm, which meant adding four courses of brickwork to the outer leaf and two courses to the inner leaf.
✅ Installing a brand-new heavy-duty lintel, cavity tray and weep vents.
✅ Carefully toothing out and rebuilding the brickwork around the window and door openings for a seamless finish.
✅ Structurally preparing the opening ready for the installation of the new bi-fold doors.
✅ Installing a temporary weatherproof roof to protect the inside of the property until the new roof could be installed.
While the roof was off, the customer mentioned the room had always been cold. After investigating, we found large sections of missing cavity insulation. We removed what we could access and replaced it with premium insulation throughout the accessible areas, helping to significantly improve the property’s thermal performance.
As always, all waste was removed from site, everything was left clean and tidy, and the project was left ready for the next trade to continue.
At First Rate Brickwork, we take pride in doing things properly—not just completing the brickwork, but making sure our customers homes are protected every step of the way.
If you’re planning an extension, renovation or any brickwork, get in touch for a free, no-obligation quotation.