31/01/2026
🔨 Before • During • After 🏡
BEFORE
This property had a layout that no longer suited modern family living, with limited space and flow. The aim was to significantly increase usable living space and create a home that works better day to day.
DURING
Over a 21-week build (including a 2-week break over Christmas 🎄), we completed a part double rear & side extension and part single rear extension, transforming the property inside and out.
Works included:
• Demolition of existing rear areas
• Groundworks and new foundations
• Structural alterations and steel installation
• Construction of a part double rear & side extension
• Construction of a single rear extension
• Brickwork carefully matched to the existing house
• New roofing, drainage, windows and doors
Internally, this allowed for the creation of:
• A spacious new kitchen & dining area
• A utility room
• A new family bathroom
• A new master bedroom with en-suite
AFTER
The result is a bright, modern home with greatly improved space, layout, and functionality — designed around how the homeowners actually live.
📸 More finished photos to follow, including full interior shots once final details are complete.