23/01/2026
Progress on site – RC groundwork works ongoing 👷♂️
Formwork currently being installed with reinforcement progressing alongside. Shutters are going in stage by stage, steel is being fixed and checked, and the groundwork is being built up ready for the next pours.
This phase is all about accuracy and planning — getting the setup right so the concrete works run smoothly when the time comes. Solid progress being made, even in tough ground conditions.
If you’re looking for a reliable formwork and RC gang for foundations, ground beams, or wider civils works, we’re always open to upcoming packages.
📩 Get in touch.
S-I-R Formwork Solutions
Built properly. From the start.