Back on site today at the YNOT launderette!! skylight install more framing for the roof tomorrow Plaster boarding starts...
24/08/2026

Back on site today at the YNOT launderette!! skylight install more framing for the roof tomorrow Plaster boarding starts again. Dot and dab on the walls.

Well, that’s the main part of the house ceiling completed now onto the master bedroom and ensuite. More frames to build ...
19/08/2026

Well, that’s the main part of the house ceiling completed now onto the master bedroom and ensuite. More frames to build angles to sort out cables to finish and extraction.. but that’s next week now two days off.

been a long hot week of cable running and more suspended ceiling fitting and plaster boarding with a beer at the end of ...
14/08/2026

been a long hot week of cable running and more suspended ceiling fitting and plaster boarding with a beer at the end of today as ran out of pepsi.! average temp inside the glass house was 30.7 deg.

Little bit of alteration last week. Bashing out a wall and rebuilding studs to create a separate shower room toilet and ...
05/08/2026

Little bit of alteration last week. Bashing out a wall and rebuilding studs to create a separate shower room toilet and utility room.

Quick pitstop at the beach hut again to install a couple of handy shelves. Next stop the ice cream shop. 🙂
27/07/2026

Quick pitstop at the beach hut again to install a couple of handy shelves. Next stop the ice cream shop. 🙂

15/07/2026
well after long hot slog in the heat over the past week and this week im finally done. looking good although i wouldn't ...
15/07/2026

well after long hot slog in the heat over the past week and this week im finally done. looking good although i wouldn't want to do this kit again.

Another day and a little bit further forward. Still have no idea where half the supplied materials go. There is enough t...
03/07/2026

Another day and a little bit further forward. Still have no idea where half the supplied materials go. There is enough to build it again! And non of it is that good. Twisted poorly machined and no a lot of quality. Apart from the metal roof sheets and celotex! Windows look good though.

Well after another hard day of trying to make heads and tails of the instructions to a building we don’t have we nearly ...
02/07/2026

Well after another hard day of trying to make heads and tails of the instructions to a building we don’t have we nearly have a water tight shell. How we have to try and figure out how all the windows and doors go in! With no frames we can find! Just lots of strips of wood.. lots!

What a long day. First 4 hrs unloading and unpacking then sorting out what goes where!  But nearly got to a point I want...
01/07/2026

What a long day. First 4 hrs unloading and unpacking then sorting out what goes where! But nearly got to a point I wanted to. Back at it tomorrow. Fingers crossed all goes better/faster.