Total Design Group

Total Design Group Total Design Group delivers commercial, retail, industrial and restaurant fit-outs that are ready to perform from day one.

From design to completion, we manage every detail so your space works exactly as it should. Whether you're planning a refurbishment of your Coffee Shop, Food To Go outlet, Concession or Office Space or looking to refit a large chain of stores, our expertise, unique design approach and large knowledge base will ensure you get the optimum solution

Following an intensive 6 month journey, Tesco’s new site in Watford on St Albans Road opened its doors to the local comm...
01/05/2026

Following an intensive 6 month journey, Tesco’s new site in Watford on St Albans Road opened its doors to the local community last week.

Our works consisted of;
Full internal demolition
Kingspan roof replacement
Gravity drainage installation
Car park strengthening and resurfacing
MF ceiling and partitioning
New floor coverings throughout
Full decorations internally and externally
Install of internal fixtures and fittings

A great effort from all involved to achieve this

Special thanks to our trusted supply chain
AJD Interiors
Russell Building
T&H Contract Services Ltd

Well done all & congratulations to Luke Kelsey and his team

Another successful project completed by the Total Design team! πŸ‘·β€β™‚οΈπŸ”¨We recently carried out extensive flooring works at ...
05/03/2026

Another successful project completed by the Total Design team! πŸ‘·β€β™‚οΈπŸ”¨

We recently carried out extensive flooring works at the One Stop Stores Ltd on Garden Lane in Chester.

The existing floor structure had deteriorated over time, with rotten joists causing the floor to sag in several areas. To resolve the issue properly, we cleared the store and lifted the entire wooden floor throughout both the shop floor and back-of-house areas.

Our team then:
β€’ Replaced the damaged joists
β€’ Installed a brand-new structural wooden floor
β€’ Carefully removed internal walls during the process and rebuilt them once the new floor was in place
β€’ Laid new tile flooring throughout the store
β€’ Replaced ceiling tiles
β€’ Installed additional perimeter whiteboarding

The result is a fully restored, structurally sound space ready for day-to-day operations again.

Thank you to our colleagues at RBPS for their hard work as well as AC Electrical for getting this over the line.

Great work by the team delivering another high-quality refurbishment project from start to finish. πŸ‘

Exciting News - Tesco Express Watford Coming Soon April 2026We are now into week 17 of 21 of a brand-new development for...
02/03/2026

Exciting News - Tesco Express Watford Coming Soon April 2026
We are now into week 17 of 21 of a brand-new development for Tesco in Watford.
So far TDS have completed a full strip out of a restaurant including all non-structural internal elements - furniture, fixtures, kitchen equipment, flooring, ceilings

We have undertaken a full Kingspan roof replacement and 2 x elevations of slate tiles
New steelwork has been installed and floor levels raised, concreted and screeded
The MF ceiling system and party wall has now been completed to form the Tesco demise and sublet unit.
The car park strengthening and resurfacing works are ongoing and we are now into the internal shopfitting elements

Stay tuned for more updates

Our strong start to 2026 continues with another successful Tesco Express opening this time in Bovey Tracey, Newton Abbot...
06/02/2026

Our strong start to 2026 continues with another successful Tesco Express opening this time in Bovey Tracey, Newton Abbot.

Delivered over four weeks from 5 January to 2 February, the project was completed on time and handed over to a satisfied client.

Works included a remodel of the existing store, with new rooftop plant installed by street lift, upgraded chillers, new shelving, and a full internal & shopfront redecoration. We also tackled and resolved existing drainage issues to ensure the store is ready for long-term operation.

With thanks to SJH, Case Security, Space Engineering Services Ltd, INTOHEAT Ltd, Pure Cold Solutions Ltd, and Pearce Signs

Well done to Lee Jermy and his team!

We are pleased to present the newly fitted Coop Travel in Litchfield. Their existing store had to be vacated and move in...
03/02/2026

We are pleased to present the newly fitted Coop Travel in Litchfield. Their existing store had to be vacated and move into new premises in the same shopping centre.
For this new store we renovated both ground and first floors, including the flooring, decorating, heating, AC, and relining of the walls. We also installed the new Bureau de Change & bespoke central hub to greet customers as they walk in.

Decoration was carried out by J T PAINTING & DECORATING LIMITED
Signage supplied and fitted by Key2 Group (UK)

Well done to Stuart Gander and his team on a successful and smooth fitout!

We're pleased to present this new Tesco Express store in West Kilburn, Harrow Rd, London. This 7 week project started on...
08/12/2025

We're pleased to present this new Tesco Express store in West Kilburn, Harrow Rd, London. This 7 week project started on 6th Oct and opened its doors on the 24th November.

The existing site had to have some demolition completed, as well as repairing some leaky roofs!

Once we completed this we were able to complete our other works, including;

Β· Decorations to entire shopfront and throughout
Β· New Concertina Shutters
Β· New chillers
Β· New staff kitchen
Β· New floor throughout
Β· New shelving
Β· New resin entrance externally and internal matwell

Well done to Lee Jermy, and many thanks to PRL Group, Case Security, Space Engineering, AJD Interiors and RBPS!

Check out our before and after photos!

πŸš€ Project Complete: New Tesco Store – Napier Road, GillinghamProud to share that Total Design Shopfitting has successful...
02/12/2025

πŸš€ Project Complete: New Tesco Store – Napier Road, Gillingham

Proud to share that Total Design Shopfitting has successfully completed the fit-out of the brand-new Tesco store at Napier Road in Gillingham.

What started as an empty shell just 4 weeks ago is now a fully operational store opening its doors on December 5th.

Our team delivered a full turnkey solution, including:

πŸ”Ή Constructing all internal walls
πŸ”Ή Hanging doors and completing all joinery
πŸ”Ή Installing the kitchen, staff toilet, and manager’s office
πŸ”Ή Site management of all additional trades including electrical, refrigeration, shelving installations, and counters

A huge thankyou to our dedicated team, our sister company TDS Electrical Contractors (Total Design Group) and all trusted contractors for working with precision, speed, and professionalism throughout. Another great project delivered on time and to a high standard.

Well done Paul Rogers

On to the next! πŸ’ͺ

In this year’s Advent season, Nigel the Total Design Elf has been out helping Senior Contracts Manager Jason Greenwood o...
01/12/2025

In this year’s Advent season, Nigel the Total Design Elf has been out helping Senior Contracts Manager Jason Greenwood on our latest fit-out at Channel Islands COOP – Longstore, Guernsey.
He even became a hit with the airport and flight crew β€” bagging a cockpit visit and sharing a few round the world-flight tips with the Pilots courtesy of his old mate Santa Claus.
Look out for more adventures coming soon… and yes β€” Nigel is a GOOD elf.

πŸŽ„ πŸŽ„πŸŽ„πŸŽ„πŸŽ„πŸŽ„πŸŽ„πŸŽ„πŸŽ„πŸŽ„πŸŽ„

On Monday this week we handed over this Tesco Express store in Kingsteignton. The floor had asbestos throughout, but tha...
07/11/2025

On Monday this week we handed over this Tesco Express store in Kingsteignton. The floor had asbestos throughout, but thanks to our robust health & safety practices we managed to navigate it successfully, keeping ourselves and all others trades involved safe.

Works included the redecoration of the entire shopfront, including the apex, and internal decoration. New chillers were installed, and the staff kitchen & bakery area were all given a refresh. A new acoustic plant was installed - shout out to Space Engineering Services Ltd - and new entrance matwell was installed.

Also shout out to -
INTOHEAT Ltd
Noise Solutions Ltd
Blaze Signs

Well done to Lee Jermy for another amazing job! πŸ‘

Tesco Express Woodley, Reading12 week project complete βœ…We have now completed the refurbishment of an existing Tesco sto...
03/10/2025

Tesco Express Woodley, Reading

12 week project complete βœ…

We have now completed the refurbishment of an existing Tesco store in Woodley, Reading

The store was handed over to the retail team on Monday this week and today reopened its doors to the local community.

We are sure this is going to be a very busy store which visitors will enjoy

Thank you to everyone involved for all their hard work πŸ‘

Luke Kelsey
Craig Caplen
TDS Electrical Contractors (Total Design Group)
RBPS
T&H

Address

Unit 5 Woodside Industrial Estate, Woodside Road
Eastleigh
SO504ET

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+442380629296

Alerts

Be the first to know and let us send you an email when Total Design Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Total Design Group:

Share