04/05/2026
Wow!🤩 🤩 🤩
After what seems an eternity the big job is finally finished!!
From ceilings falling down to walls with massive holes this has been a task to say the least!
The amount of prep that went into this was unreal!
All worth it in the end though 🤩
- Walls and ceilings stripped
- prepared fully
- linned with 1800 grade lining paper
- ceilings and coving all painted with Johnstones ultra flat matt
- walls painted with Johnstone’s acrylic durable matt
- All wood work including windows (Rads too) painted with aqua guard undercoat then aqua guard satin