CBM.Roofing ltd

CBM.Roofing ltd Over 20 years experience in all aspects of pitched and flat roofing. Honest, professional & reliable
(1)

New rivendale fiber cement roof installed over in Brentford.80mm hard board insulation installed to front and rear roof ...
18/04/2026

New rivendale fiber cement roof installed over in Brentford.
80mm hard board insulation installed to front and rear roof slopes, counter battoned and battoned to allow airflow. New fasciaโ€™s and gutters over fascia vents and eve support trays. New lead flashings, rendered party walls.
Flank wall repointed. Dry ridge to finish.
Roofs done right!! Roofs done to last ๐Ÿ–ค๐Ÿš๏ธCBM LTD๐Ÿ ๐Ÿ’›

Massive moss removal completed over in addlestone. We started this in February and March. This was an Inbetween job that...
18/04/2026

Massive moss removal completed over in addlestone. We started this in February and March. This was an Inbetween job that we would drop back onto between other projects.
This was by far the biggest one weโ€™ve undertaken so far! All done by hand!! All mossed removed and gutters cleans on completion.
๐Ÿ–คCBM ROOFING LTD๐Ÿ’›

Flat roof replacement over in St Margrets for other one of or estate agents snellers!! Solar panels and frame work remov...
25/01/2026

Flat roof replacement over in St Margrets for other one of or estate agents snellers!! Solar panels and frame work removed. New 18mm OSB ply. Three layer torch on felt flat roof system installed. New lead flashings.
All solar panels and frame work reinstalled and reconnected.
๐Ÿ–ค๐Ÿš๏ธCBM๐Ÿ ๐Ÿ’›

New roof replacement over in new haw! Stripped, roof pitch insulated, eve support trays, new felt and battons. New fasci...
25/01/2026

New roof replacement over in new haw! Stripped, roof pitch insulated, eve support trays, new felt and battons. New fascia guttering and barge boards. Roof finished in grey concrete tiles, new lead flashings.
๐Ÿ–ค๐Ÿš๏ธCBM๐Ÿ ๐Ÿ’›

Dormer roof replacement over in Hampton. Three layer torch on system!! Only the best materials as always.๐Ÿ–ค๐Ÿš๏ธCBM๐Ÿ ๐Ÿ’›๏ฟผ
25/01/2026

Dormer roof replacement over in Hampton. Three layer torch on system!! Only the best materials as always.
๐Ÿ–ค๐Ÿš๏ธCBM๐Ÿ ๐Ÿ’›๏ฟผ

Summer house roof replacement in shepperton. As always torch on felt system.๐Ÿ–ค๐Ÿš๏ธCBM๐Ÿ ๐Ÿ’›
25/01/2026

Summer house roof replacement in shepperton. As always torch on felt system.
๐Ÿ–ค๐Ÿš๏ธCBM๐Ÿ ๐Ÿ’›

Top section removed due to being unsafe. Vented stopper cowls installed to allow for air flow.๐Ÿ–ค๐Ÿš๏ธCBM๐Ÿ ๐Ÿ’›
25/01/2026

Top section removed due to being unsafe. Vented stopper cowls installed to allow for air flow.
๐Ÿ–ค๐Ÿš๏ธCBM๐Ÿ ๐Ÿ’›

Big rubber roof rip up that was holding water lake a swimming pool!! Unfortunately what happens when someone doesnโ€™t kno...
25/01/2026

Big rubber roof rip up that was holding water lake a swimming pool!! Unfortunately what happens when someone doesnโ€™t know what they are doing!! Roofs stripped, outlets widened for better drainage. Balcony removed along with existing coping stones . ๏ฟผNew furrings and osb plying deck, three layer torch on felt system. New lead flashings and copping stones to finish.
A very happy and satisfied ๏ฟผcustomer as per usual.

๐Ÿ–ค๐Ÿš๏ธCBM๐Ÿ ๐Ÿ’›

Flat roof replacement, new black fascia, vented soffit and guttering.๐Ÿ–ค๐Ÿš๏ธCBM๐Ÿ ๐Ÿ’›
25/01/2026

Flat roof replacement, new black fascia, vented soffit and guttering.
๐Ÿ–ค๐Ÿš๏ธCBM๐Ÿ ๐Ÿ’›

Replacement fascia and guttering to three garages over in isleworth for one of estate agents last year. ๐Ÿ–ค๐Ÿš๏ธCBM๐Ÿ ๐Ÿ’›๏ฟผ
25/01/2026

Replacement fascia and guttering to three garages over in isleworth for one of estate agents last year.
๐Ÿ–ค๐Ÿš๏ธCBM๐Ÿ ๐Ÿ’›๏ฟผ

25/12/2025
Big overhaul over in Staines last week getting this old roof winter ready for the new home owner.De-mossed, dental fille...
10/09/2025

Big overhaul over in Staines last week getting this old roof winter ready for the new home owner.

De-mossed, dental fillets and old soakers removed and replaced with new lead flashing front and rear.
Vented stopper cowls installed. New gutters, downpipes and eve support trays.

Rear low level flat roof stripped, warm roof installed three layer torch on felt, new lead flashing finished off with new upvc fascia, gutter and down pipe.
๐Ÿ–ค๐Ÿš๏ธCBM๐Ÿ ๐Ÿ’›

Address

Malthouse Lane
Egham
TW209BD

Alerts

Be the first to know and let us send you an email when CBM.Roofing ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to CBM.Roofing ltd:

Share