02/08/2022
This week we have been carrying out some temporary repairs to a large Grade 1 listed building at St.Peters School, Clifton, York. (The school of Guy Fawkes )
A Grade 1 listed building means "`The site is of exceptional national, architectural or historical importance." Therefore it is extremely rare and valuable.
As a temporary solution, new lead and new slates have been installed to prevent further water ingress for the next few months, until such time when a full replacement roof can be carried out using the original materials, where possible and also where feasible!!!.
Obviously new additional materials will be required to replace all the damaged and un-usable materials, but these will be sourced to match the orginal roof coverings. (Unlike the new slates that have been installed as a temporay measure. These are quite obviously not a good match, but they will keep the roof watertight for the next few months temporarily.)
The new roof is being installed starting next summer in 2023.
It's a beautiful building and we are lucky and proud to be qualified to work on a building with all of this heritage!