13/06/2026
Another job complete in the past couple weeks.
Not sure what was going on, but the soil stack was coming out the cavity wall into the exposed chamberโฆ. The sheer drop causing the chamber to block as there wasnโt a gradual flow.
We found the existing line originally used for the soil stack and reconnected it, cleaned the chamber and installed a new chamber top.
Job done โ