A lovely project that was undertaken back in the summer. New bifold doors and new composite decking have not only enhanc...
26/10/2023

A lovely project that was undertaken back in the summer. New bifold doors and new composite decking have not only enhanced the outside space of this cottage but has turned a dead end room into a lovely garden room. Swipe for before and after.

It’s always good to get your teeth stuck into a new project.  This is going to be a stunner.
18/09/2023

It’s always good to get your teeth stuck into a new project. This is going to be a stunner.

What a couple of months it has been. The weather gods were against us from the beginning. Due to constricted space at th...
28/01/2023

What a couple of months it has been. The weather gods were against us from the beginning. Due to constricted space at the front of the property we were unable to install a cover over the property to keep not only the team dry, but more importantly, the house.

We have transformed a roof space that was ripe for renovating from a storage area to an en-suite master bedroom with bifold doors and Juliet balcony.

Swipe for before, during and after pics.

Hey all it’s been a while…….So here are some photos of a very recent kitchen install that RMS completed for a customer i...
29/10/2022

Hey all it’s been a while…….
So here are some photos of a very recent kitchen install that RMS completed for a customer in the South Hams.
Dove Grey cabinets with a solid laminate work surface.

Watch this space for a new Dormer project that RMS is starting very soon……..

Lovely evening on the beach. 🏄‍♂️🐶
09/08/2022

Lovely evening on the beach. 🏄‍♂️🐶

Been very quiet on here recently but after finishing this Dormer for a client in Seaton, I felt it was time for a post t...
22/05/2022

Been very quiet on here recently but after finishing this Dormer for a client in Seaton, I felt it was time for a post to show that RMS is still busy producing the goods to achieve our clients wishes.

This bungalow already had 2 bedrooms in the converted roof space, but due to the slope of the roof, it made getting to each bedroom quite awkward. The dormer as designed by not only gave both bedrooms a proper landing but also an additional guest bathroom.

The dormer has been clad in anthracite grey single ply and vertical hung tiles.

Single ply by Lee Marks Roofing Ltd.
Tiling by
Plumbing by Gas-Exe Plumbing and Heating Services.

When not busy renovating the cottage, RMS somehow managed to squeeze in some exciting projects for customers. Project 2 ...
06/06/2021

When not busy renovating the cottage, RMS somehow managed to squeeze in some exciting projects for customers.

Project 2 - transforming a dated and gloomy bathroom which had seafood (that is not a typo 🦞) tiles, a dark slate floor and blue walls. The customer wanted to give the bathroom the character that the stunning Edwardian property deserved. The customer also wanted to replace the tired electric shower for a mixer shower. The white metro tiles with silver grey grout, white walls and hand painted floor tiles, have brought an air of lightness and style to this family bathroom.

When not busy renovating the cottage, RMS somehow managed to squeeze in some exciting projects for customers. Project 1 ...
06/06/2021

When not busy renovating the cottage, RMS somehow managed to squeeze in some exciting projects for customers.

Project 1 - transforming an unloved and unused garden space, into a multifunctional area for outdoor dining and family time. The customer had the idea of essentially having an additional room outside and a more appealing outlook from their family room. We achieved this by removing some old sleepers, soil and gravel and building a 16m wall and topping it off with a Siberian Larch slated fence and an Indian Sandstone patio.

Hey all, it’s been a while. Work on completing the cottage has been going on but not a lot of it is noticeable with a pi...
03/05/2021

Hey all, it’s been a while. Work on completing the cottage has been going on but not a lot of it is noticeable with a picture, snagging list is growing but also being ticked off.

The bedroom in the side extension is now complete, the electrical second fix in the downstairs part of the side extension has also been finished. Once the finished flooring has been laid in that area, the cloakroom, boot room, office and laundry areas can all be completed.

The one noticeable change is outside. The retaining walls which form the courtyard and raised beds have been rendered. What a transformation, no more looking at concrete blocks. Once painted we can then look to get the area slabbed.

#

Roll back to 12 months ago. The big dig started today and just over 2 weeks later 600 tonnes of soil had been removed fr...
17/02/2021

Roll back to 12 months ago. The big dig started today and just over 2 weeks later 600 tonnes of soil had been removed from site. It wouldn’t be until September that the final set of footings would be dug out which resulted in another 150 tonnes being removed.

The Bridge Cottage story:Back on 9 Nov 19 we became the new owners of Bridge Cottage, It wasn’t until 9 Jan 20 that work...
10/01/2021

The Bridge Cottage story:
Back on 9 Nov 19 we became the new owners of Bridge Cottage, It wasn’t until 9 Jan 20 that work commenced on what would be the biggest project I/RMS have ever undertaken. With everything that 2020 has thrown at us, Weather, Virus, Lockdown, material shortages and delayed deliveries, 22 Dec 20 saw Bridge Cottage turn from being a renovation project to becoming our new home. The design brief that both myself and .bridgecottages gave Mark and Doug at have come to fruition even though there are a few things to be finished off, like sorting out a back door for starters but the main areas of the cottage are complete and habitable. Obviously the start to 2021 isn’t ideal but hopefully it will allow finishing off the project and being able to enjoy the cottage.

#

The site has been busy busy throughout November and the beginning of December.  So what has happened I hear you ask? Wel...
08/12/2020

The site has been busy busy throughout November and the beginning of December. So what has happened I hear you ask? Well, the snug is complete I can’t wait to take a pew In here with a beer or two. The herringbone parquet flooring from will go through the lounge and into the kitchen. The bare metal column radiator from set the tone in this relaxing room.

The roof has been completed on the side extension using a natural slate tile along with galvanised guttering. We have also knocked through from the lounge into the side extension so all the dirty muddy work on the cottage is now complete. This work has racked up another 3 tons of soil to dispose of. The pros and cons of a cob cottage I suppose.

I will finish off the update with a little bit of luxury, the en-suite bathroom is now ready for use. 🚿 👍🏻👍🏻
#