Ben Allan joinery

Ben Allan joinery Joiner working in the central belt

Renovation works recently completed transforming the downstairs of this property 😍- ceilings strapped, plaster boarded a...
07/07/2026

Renovation works recently completed transforming the downstairs of this property 😍

- ceilings strapped, plaster boarded and Ames taped to remove the artex look
- walls plastered
- media wall constructed
- kitchen replaced
- floor fully screeded and LVT herringbone laid
- all wood work replaced
- new doors and radiators fitted
- electrics upgraded including new black sockets/switches and new spotlights

A satisfying project to be part of πŸ‘ŒπŸ½

Stunning flooring job completed πŸͺ΅ Oak engineered herringbone flooring laid throughout this large lounge and hall area in...
08/06/2026

Stunning flooring job completed πŸͺ΅

Oak engineered herringbone flooring laid throughout this large lounge and hall area in this house, giving it a flawless timeless authentic feel. Original skirting boards kept with the flooring sliding underneath 🀌🏼

Part 2 of a full house renovation project we’ve recently completed 🏠 πŸ”¨ - media wall installed in the longe - wall under ...
02/06/2026

Part 2 of a full house renovation project we’ve recently completed 🏠 πŸ”¨

- media wall installed in the longe
- wall under stairs knocked through to include outdoor coal storage area into hall space
- stairs completely renovated including new handrail, base rail, spindles and stringers cladded to give a fresh appearance
- new doors and woodwork throughout the hall and lounge
- engineered herringbone flooring fitted in the hall and lounge
- slat wall panelling installed at the top of the stairs as a feature wall and around the meter box
- electrics upgraded
- new radiator installed
- new back door fitted
- fully plastered and decorated

Big thanks to the team πŸ™ŒπŸΌ

Part 1 of a full house renovation project that we’ve recently completed 🏠 πŸ”¨ - new kitchen fully installed- wall between ...
01/06/2026

Part 1 of a full house renovation project that we’ve recently completed 🏠 πŸ”¨

- new kitchen fully installed
- wall between kitchen and dinning room knocked through to create an open plan space
- door in to lounge enlarged to allow for a bi-fold door to be installed
- engineered herringbone flooring laid
- new woodwork and doors fitted
- fully rewired
- new radiator installed
- room fully plastered and decorated

Was a pleasure working on this one and satisfying seeing the transformation complete πŸ‘ŒπŸ½

Kitchen renovation complete recently  πŸ”₯ πŸ”¨ - supporting wall knocked and and steel beam installed - all electrics rewired...
29/01/2026

Kitchen renovation complete recently πŸ”₯ πŸ”¨

- supporting wall knocked and and steel beam installed
- all electrics rewired
- plumbing complete with new tower radiator
- all plastering works undertaken
- kitchen fully fitted
- LVT tiles laid and complete with new woodwork


Address

Falkirk

Telephone

+447860843661

Website

Alerts

Be the first to know and let us send you an email when Ben Allan joinery posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Ben Allan joinery:

Shortcuts

Share

Category