19/06/2026
Full ensuite installation complete in Brandon over the last couple of weeks. ๐
This room began as a simple storage room that was built as part of extension 8 years ago, with the incentive to have it turned into an ensuite at some point, and that day finally come around!
Firstly we had to run hot & cold feeds, as well as radiator feeds to the new ensuite from the pipework in the original house loft. Once this was complete, we then had to install the new drainage inside for the toilet, basin & shower. We then dug up the driveway and connected in the new drainage pipes to the existing drains. Finally, we then installed the shower panels along with the full ensuite.
We are always taking on more work so donโt hesitate to contact us for any of your building projects or home renovations! ๐ ๏ธ