It's been a while since we've posted so here's one of our latest projects.
The brief here was to strip out the existing, dated shower room and fit a sleek, new, modernised bathroom.
The job wasn't without it's challenges due to the metal beamed construction of the house for running in new pipe work however we adapted and overcame.
Firstly came the strip out, removing all sanitary ware, plastic ceiling, poorly constructed framing for the plastic ceiling, some rotten floorboards and removal of some wall tiles, floor tiles and backer board.
Next came dot-dab of plaster board where required, then came new framing for new ceiling and a fresh plasterboard ceiling which was then duly skim coated by our plasterer. Our electrician was next in installing 5 spotlights on a dimmer switch and cable work for LED mirror.
Next we ran in the pipework in the appropriate positions for the new sanitary ware and followed that up by sheeting the floor. That was followed by installation of the bath. then came our tiler installing 600mm x 300mm wall tiles and 600mm x 600mm floor tiles leaving an exceptional finish as always.
That just left the sanitary ware and new towel warmer to be fitted out and handed back to our customers who were delighted with all aspects of their new bathroom.
Enjoy guys and happy bathing!