16/08/2026
Job completed in Coatbridge. On this job we created a downstairs toilet from scratch. We opened up underneath the stairs with building a new partition finishing it with gyproc. New door frame with oak door with new facings and skirtings. We also opened up the floor and run new four inch waste pipe and new hot / cold feeds for the new high gloss vanity sink with a brass mixer tap. We also had a high gloss vanityWC unit with brass push button. We fitted all walls with our Tarbet tile effect pvc panels. New plywood to the floor with medium oak vinyl flooring fitted. We also added new lighting with brass downlights with a high gloss pvc ceiling with new switches. New brass framed led mirror with brass trims. We boxed in the electrical unit with a new access panel. In the hall we fitted new black led downlights and had the ceiling and partition plastered. At the staircase we framed with new timber. New glass brackets fitted in preparation of a custom glass being fitted. This has been templates and will be fitted soon.
This full job was supplied and fitted in just four days with all trades supplied 😮💨
Have you ever thought about creating a downstairs toilet ? Contact the team today 💯
FREE DESIGN & QUOTES
FIVE STAR REVIEWS ⭐️⭐️⭐️⭐️⭐️
[email protected]
www.craigsjoineryandbathrooms.co.uk
📲07930264132