01/02/2025
Another bathroom completed. Never seen a floor so far out of level. Customer wanted the shower tray on the deck and the internal soil stack in the aparment block was positioned behind the toilet, we were able to get the shower waste under the floor and lay the tray on the floor. We had to reinstate the fire protection on this floor so had to put 18mm ply screwed to the joists, then 18mm concrete board for the fire protection, and as you can see the floor was so far out it took at lot of fibre self leveler. Customer was made up with it. And we know them floor tiles won't crack like the old ones now the floor is fitted correctly