16/06/2026
Full steam ahead externally on our extension and refurbishment project. Driveway dug out and type 3 being laid and compacted ready for the porous concrete and resin when the storage shed and summer house are being installed in the garden. Then the resin can be laid to the patios and pathways. Inside we are almost there, just finishing the decoration and waiting for some bespoke materials. Think itβs time to cut the grass π€£Looking good everyone, well done ππΌππΌππ»ππ» if this is something you are thinking about or even part of this project, give us a call 01582 722119 or email [email protected] and we can take you from design to completion.