Magic decorating new

Magic decorating new Transform your space with Magic Decorating! Expert painters & decorators making your vision a reality

31/05/2026

A stunning transformation completed for 🏑✨

This bungalow was stripped back to its bare bones and completely reimagined into a luxury showcase home.

Featuring impressive glulam beams, bespoke steelwork, and expansive open-plan living spaces, every detail has been designed to maximise light, space, and modern living.

For the decorating package, we used:

βœ”οΈ UV Oil to seal and protect the beautiful exposed beams

βœ”οΈ Vinyl Matt White on walls and ceilings for a clean, bright finish

βœ”οΈ Multi Surface Satin White on all woodwork for a durable, flawless finish

The result is a contemporary space that perfectly complements the exceptional craftsmanship delivered throughout the project.

Great to be part of another fantastic build with Redhill Construction.

All materials supplied by

27/05/2026

Behind the Scenes Wednesday for πŸŽ₯

Today we:
βœ”οΈ Sanded all walls and ceilings
βœ”οΈ Applied the top coat to the kitchen ceiling
βœ”οΈ Completed the first coat of Farrow & Ball school house white modern emulsion in the kitchen and utility room

You can also see at the end that the Thame project is progressing really well πŸ‘Œ

26/05/2026

Behind the scenes Tuesday for at the Princes Risborough project πŸ‘Œ

We’re working through the kitchen, utility and hallway areas this week.

Today’s progress:
βœ”οΈ All rooms fully sheeted up
βœ”οΈ Woodwork fully prepped
βœ”οΈ Two coats completed on the kitchen woodwork

The Thame project is progressing nicely too, with rooms being completed and new areas now underway 🎨

Keep watching!

All materials supplied by

25/05/2026

Behind the scenes at Magic on a Monday πŸ‘Š

All systems go today at the Thame project.

βœ”οΈ Bedroom fully prepped
βœ”οΈ Ceiling & walls painted
βœ”οΈ Landing woodwork fully prepped and first coat applied β€” including the staircase
βœ”οΈ Master bedroom walls & woodwork painted
βœ”οΈ En-suite fully prepped
βœ”οΈ Downstairs bathroom woodwork painted

Another productive day with the team pushing the project forward.

24/05/2026

Friday at the Ridgeway interiors project in Didcot πŸ”¨

All walls filled, sanded, and painted βœ”οΈ
All woodwork prepped and first coat applied βœ”οΈ

Another productive week working with Ridgeway Interiors.

Keep watching to see a couple of the other jobs we completed this week πŸ‘€

18/05/2026

Fresh coat, fresh look ✨

This handrail was treated with Sadolin wood stain to enhance the grain and give it long-lasting protection against the elements.

To help speed up the drying times, we added Rustins driers for a smoother, quicker finish without compromising the quality.

Clean finish. Rich colour. Protected for years to come. πŸ”₯

All materials supplied by

14/05/2026

A closer look at this exterior transformation in progress πŸŽ₯

Every step started with the prep β€” scraping back all loose and flaking paint before treating the surface with a fungicidal wash and sealing it with Peel Stop.

Once everything was filled and sanded smooth, the walls were finished in Smooth White Masonry Paint for a crisp, long-lasting finish.

All paint supplied by

12/05/2026

Two rooms. One clean two-tone finish. 🎨

Fresh walls, sharp lines, and a modern colour split that completely changed the feel of these spaces.

From prep to final coat, every detail finished to a high standard.

Which room is your favourite? πŸ‘€

23/04/2026

Thursday on site πŸ’ͺ

Over at the Haddenham project for Ridgeway Interiors:
β€’ Cupboard fully prepared
β€’ Sprayed with a primer suitable for MDF and bare plaster
β€’ Everything progressing nicely and ready for the next stages 🎨

We’ve also officially signed off the Henley project for Redhill Construction βœ”οΈ

Another productive day with jobs moving forward nicely ✨

21/04/2026

Tuesday on site β€” new project in Haddenham for πŸ’ͺ

Liam getting everything prepped and protected:
β€’ Kitchen taped and draped
β€’ All units and windows caulked
β€’ Walls, woodwork, shelves, and boxing filled
β€’ Flooring taped off along the skirting

πŸ’‘ Top tip: Always caulk your units before taping them β€” if you caulk onto tape, you risk pulling it off when you remove it later πŸ‘€

Proper prep in place β€” ready for paint 🎨✨

All materials supplied by

Address

Sheerstock
Haddenham

Alerts

Be the first to know and let us send you an email when Magic decorating new posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share