25/08/2026
Another successful project almost completed just buffer tanks and Q-ton water heating to go š
Great to see the Clade ASHPs now installed and sitting on our structural bases.
This one came with its challenges, mainly the very tight space we had to work with. Using a traditional concrete base in this location would have been a nightmare, with difficult access, additional labour, curing times and a lot more disruption on site.
Our LGSF base system gave us a much more practical solution. We were able to get the structure into a restricted area, install it efficiently and provide a solid, purpose-built foundation ready for the heat pumps.
Itās projects like this that really show where our system comes into its own. Not every site is straightforward, and sometimes the traditional way simply isnāt the best way.
Another good job from the team and great to see everything coming together.
Stay tuned loads more to come in the upcoming weeks šš¼