10/11/2021
Bit of a late one getting this family back up and running today but we did it!
Loft conversion works required a lot of existing pipework to be relocated and decommissioning of the tanks.
New unvented hot water cylinder installed and the system converted meant that there was no longer a need for bulky cold water storage tanks and shower pumps. An upgrade on the heating to make it a sealed system did away with the header tank and allows scope for heating at the top of the house.