Ambiente Systems UK

Ambiente Systems UK Ambiente Systems UK has been designing, manufacturing & supplying underfloor heating since 2006.

๐‚๐š๐ง ๐ฒ๐จ๐ฎ ๐ซ๐ฎ๐ง ๐ฎ๐ง๐๐ž๐ซ๐Ÿ๐ฅ๐จ๐จ๐ซ ๐ก๐ž๐š๐ญ๐ข๐ง๐  ๐ข๐ง ๐ฃ๐ฎ๐ฌ๐ญ ๐จ๐ง๐ž ๐ซ๐จ๐จ๐ฆ ๐จ๐Ÿ๐Ÿ ๐š๐ง ๐ž๐ฑ๐ข๐ฌ๐ญ๐ข๐ง๐  ๐œ๐จ๐ฆ๐›๐ข ๐›๐จ๐ข๐ฅ๐ž๐ซ?Yes - and itโ€™s one of the most common retro...
02/09/2026

๐‚๐š๐ง ๐ฒ๐จ๐ฎ ๐ซ๐ฎ๐ง ๐ฎ๐ง๐๐ž๐ซ๐Ÿ๐ฅ๐จ๐จ๐ซ ๐ก๐ž๐š๐ญ๐ข๐ง๐  ๐ข๐ง ๐ฃ๐ฎ๐ฌ๐ญ ๐จ๐ง๐ž ๐ซ๐จ๐จ๐ฆ ๐จ๐Ÿ๐Ÿ ๐š๐ง ๐ž๐ฑ๐ข๐ฌ๐ญ๐ข๐ง๐  ๐œ๐จ๐ฆ๐›๐ข ๐›๐จ๐ข๐ฅ๐ž๐ซ?
Yes - and itโ€™s one of the most common retrofit setups we design.

For a kitchen extension, garage conversion or single refurbished room, wet UFH can often run alongside the existing radiator system without replacing the boiler.

But there are a few things that need to be right:
๐Ÿ”ธCorrect blended flow temperature
๐Ÿ”ธIndependent zone control
๐Ÿ”ธThe right mixing arrangement for the number of loops
๐Ÿ”ธBoiler modulation low enough to avoid short-cycling

Our latest installer guide breaks down the setup, the common watch-outs, when to use a compact single-zone mixing unit versus a manifold, and includes a worked 20mยฒ kitchen example.

Full guide in the first comment.

31/08/2026

๐€ ๐›๐จ๐ข๐ฅ๐ž๐ซ ๐ฉ๐ฎ๐ญ๐ฌ ๐จ๐ฎ๐ญ ๐Ÿ”๐ŸŽ ๐ญ๐จ ๐Ÿ•๐ŸŽ ๐๐ž๐ ๐ซ๐ž๐ž๐ฌ. ๐”๐ง๐๐ž๐ซ๐Ÿ๐ฅ๐จ๐จ๐ซ ๐ก๐ž๐š๐ญ๐ข๐ง๐  ๐ฐ๐š๐ง๐ญ๐ฌ ๐ฌ๐จ๐ฆ๐ž๐ญ๐ก๐ข๐ง๐  ๐œ๐ฅ๐จ๐ฌ๐ž๐ซ ๐ญ๐จ ๐Ÿ‘๐Ÿ“ ๐ญ๐จ ๐Ÿ’๐Ÿ“.
The blending valve is what stands between the two, and most people never see inside one.
Hot flow enters one chamber. Cool return from the floor enters another. A thermostatic element expands and contracts between them, throttling one side or the other to hold whatever temperature has been set.
Which works until the pressure upstream is too high. Push hard enough and hot water goes straight through, and the floor sees a temperature it was never designed for.
We explain it with a cutaway, so you can see what actually moves.
๐Ÿ‘‡Playlist in the comments.
What blend temperature do you set as standard?

๐ƒ๐ž๐ฌ๐ข๐ ๐ง๐ž๐ ๐›๐ฒ ๐ญ๐ก๐ž ๐ฉ๐ž๐จ๐ฉ๐ฅ๐ž ๐ฐ๐ก๐จโ€™๐ฏ๐ž ๐Ÿ๐ข๐ญ๐ญ๐ž๐ ๐ข๐ญ.A fiddly manifold connection might only cost a few minutes.Across 300 plots, tho...
26/08/2026

๐ƒ๐ž๐ฌ๐ข๐ ๐ง๐ž๐ ๐›๐ฒ ๐ญ๐ก๐ž ๐ฉ๐ž๐จ๐ฉ๐ฅ๐ž ๐ฐ๐ก๐จโ€™๐ฏ๐ž ๐Ÿ๐ข๐ญ๐ญ๐ž๐ ๐ข๐ญ.

A fiddly manifold connection might only cost a few minutes.

Across 300 plots, those few minutes become a labour line.

Thatโ€™s why we design UFH around the people installing it - not just the product itself.

Our in-house Innovation Hub turns installer feedback into practical improvements that solve real site problems:
๐Ÿ”ธPre-assembled manifolds - reducing installation time and helping one qualified installer complete work that would traditionally tie up two people.
๐Ÿ”ธSpeedGunยฎ - designed to make fixing pipe quicker and smoother using our non-stick SpeedClips.
๐Ÿ”ธTraffiPipeยฎ T16 - coloured layers give installers a clear visual indication of pipe condition, helping avoid unnecessary waste.

Then thereโ€™s the wider system around it: plot-specific drawings and labelling, familiar tooling, and installation sequencing designed around the build programme.

At oversite stage, that can mean clearer floors, straightforward pipe runs, pressure testing before screed and the UFH protected beneath the floor sooner.

At scale, UFH should be designed around the build programme - and the people delivering it.

24/08/2026

๐‚๐š๐ง ๐ฒ๐จ๐ฎ ๐ซ๐ฎ๐ง ๐ฎ๐ง๐๐ž๐ซ๐Ÿ๐ฅ๐จ๐จ๐ซ ๐ก๐ž๐š๐ญ๐ข๐ง๐  ๐š๐ง๐ ๐ซ๐š๐๐ข๐š๐ญ๐จ๐ซ๐ฌ ๐จ๐Ÿ๐Ÿ ๐ญ๐ก๐ž ๐ฌ๐š๐ฆ๐ž ๐ฌ๐ฒ๐ฌ๐ญ๐ž๐ฆ?
Yes. Just not in the same room.

Usually that means underfloor downstairs, radiators up. Where it goes wrong is the wiring, because when the radiator circuit calls for heat you do not want the underfloor coming on with it.
There is a specific way to wire the two so they stay independent, using a dedicated zone and its own valve. We walk the wiring centre, terminal by terminal.
Under a minute, and it is one of the first questions we get on any mixed system.

Playlist in the comments.
Do you spec mixed systems often, or is it usually all one or the other?

๐…๐ซ๐จ๐ฆ ๐ง๐จ ๐Ÿ๐ฅ๐จ๐จ๐ซ ๐ก๐ž๐š๐ญ๐ข๐ง๐  ๐ญ๐จ ๐‰๐จ๐…๐ฅ๐จ๐จ๐ซ ๐ก๐ž๐š๐ญ๐ข๐ง๐ .For this home refurbishment, our customer selected JoFloor 28 with the 8mm Tile...
20/08/2026

๐…๐ซ๐จ๐ฆ ๐ง๐จ ๐Ÿ๐ฅ๐จ๐จ๐ซ ๐ก๐ž๐š๐ญ๐ข๐ง๐  ๐ญ๐จ ๐‰๐จ๐…๐ฅ๐จ๐จ๐ซ ๐ก๐ž๐š๐ญ๐ข๐ง๐ .
For this home refurbishment, our customer selected JoFloor 28 with the 8mm TileTop board to suit the intended tiled floor finish.

That specification formed part of our full UFH design service, ensuring the system build-up, circuit layout and components were correctly matched to the property, floor finish and required heat output.

The complete system included AmbiFlexยฎ P12 pipe, a 5-port manifold, CircoMax pumpset, UB10 V3 wiring centre, controls and associated components.

It's a good example of where specialist UFH design matters. The floor finish, floor construction, heat source and system components all need to be considered together to deliver the right result.

"๐–๐š๐ฅ๐ค๐š๐›๐ฅ๐ž ๐ข๐ง ๐Ÿ—๐ŸŽ ๐ฆ๐ข๐ง๐ฎ๐ญ๐ž๐ฌ" ๐ข๐ฌ ๐ญ๐ก๐ž ๐ก๐ž๐š๐๐ฅ๐ข๐ง๐ž ๐Ÿ๐ข๐ ๐ฎ๐ซ๐ž ๐จ๐ง ๐จ๐ฎ๐ซ ๐จ๐ฐ๐ง ๐€๐ฆ๐›๐ข๐…๐ข๐›๐ซ๐ž ๐๐ซ๐จ ๐๐š๐ญ๐š๐ฌ๐ก๐ž๐ž๐ญ.It's true. On a heated floor, it's al...
19/08/2026

"๐–๐š๐ฅ๐ค๐š๐›๐ฅ๐ž ๐ข๐ง ๐Ÿ—๐ŸŽ ๐ฆ๐ข๐ง๐ฎ๐ญ๐ž๐ฌ" ๐ข๐ฌ ๐ญ๐ก๐ž ๐ก๐ž๐š๐๐ฅ๐ข๐ง๐ž ๐Ÿ๐ข๐ ๐ฎ๐ซ๐ž ๐จ๐ง ๐จ๐ฎ๐ซ ๐จ๐ฐ๐ง ๐€๐ฆ๐›๐ข๐…๐ข๐›๐ซ๐ž ๐๐ซ๐จ ๐๐š๐ญ๐š๐ฌ๐ก๐ž๐ž๐ญ.

It's true. On a heated floor, it's also not the number that catches people out.
The timeline for levelling over UFH:

๐Ÿ’๐Ÿ– ๐ก๐จ๐ฎ๐ซ๐ฌ ๐›๐ž๐Ÿ๐จ๐ซ๐ž - levelling over an existing heated screed? Heating off. Not turned down. Off.
๐Ÿ๐ŸŽ ๐ฆ๐ข๐ง๐ฎ๐ญ๐ž๐ฌ - working time once the bag is mixed. Only mix what you can lay.
๐Ÿ—๐ŸŽ ๐ฆ๐ข๐ง๐ฎ๐ญ๐ž๐ฌ - walk on it. That's at 20ยฐC.
๐Ÿ ๐ก๐จ๐ฎ๐ซ๐ฌ - porcelain, ceramic and natural stone. Unheated floors only. On a heated floor the drying process comes first.
๐Ÿ‘ ๐ก๐จ๐ฎ๐ซ๐ฌ - resilient coverings.
๐Ÿ๐ŸŽ ๐๐š๐ฒ๐ฌ - before the heating runs again. Then bring the floor temperature up gradually, not straight to setpoint.

It's the last one that bites. The floor looks finished on day one, the client wants heat, and someone fires it up on day three.

๐“๐ž๐ฆ๐ฉ๐ž๐ซ๐š๐ญ๐ฎ๐ซ๐ž ๐œ๐ฎ๐ญ๐ฌ ๐›๐จ๐ญ๐ก ๐ฐ๐š๐ฒ๐ฌ ๐ญ๐จ๐จ.

Below 5ยฐC the cement chemistry stalls and the set slows right down - it picks back up when the temperature does. Below freezing before it's set is the one you don't recover from. Integrity and performance are compromised.

Above 30ยฐC it goes off fast enough to be awkward to work.

๐“๐ก๐ž ๐Ÿ—๐ŸŽ ๐ฆ๐ข๐ง๐ฎ๐ญ๐ž๐ฌ ๐ข๐ฌ ๐ซ๐ž๐š๐ฅ. ๐ˆ๐ญ ๐ฃ๐ฎ๐ฌ๐ญ ๐ข๐ฌ๐ง'๐ญ ๐ญ๐ก๐ž ๐ฐ๐ก๐จ๐ฅ๐ž ๐ฃ๐จ๐›.

What's the earliest anyone's asked you to put heat through a floor after levelling?

17/08/2026

๐–๐š๐ซ๐ฆ ๐๐จ๐ฐ๐ง๐ฌ๐ญ๐š๐ข๐ซ๐ฌ. ๐๐š๐ญ๐œ๐ก๐ฒ ๐ฎ๐ฉ๐ฌ๐ญ๐š๐ข๐ซ๐ฌ. ๐๐จ๐ข๐ฅ๐ž๐ซ ๐ฐ๐จ๐ซ๐ค๐ข๐ง๐  ๐Ÿ๐ข๐ง๐ž.
If the manifold sits on the ground floor and is pushing water up to the first floor, air can collect at the high points. Enough of it and the flow rate drops away. Sometimes it stops altogether.
That is what the cold spots are. Not a failed loop, not a duff thermostat. Air sitting where the water needs to be.
We show the fix at the manifold in about a minute, plus the part you can fit so it stops happening again.
Filmed last year for Heat Hacks, and it still comes up every time the heating goes back on.
Full playlist in the comments.
Where does the air collect on the jobs you work on?

13/08/2026

๐๐ž๐ฐ ๐œ๐š๐ฌ๐ž ๐ฌ๐ญ๐ฎ๐๐ฒ: ๐ง๐ข๐ง๐ž ๐”๐…๐‡ ๐œ๐ข๐ซ๐œ๐ฎ๐ข๐ญ๐ฌ ๐๐ž๐ฌ๐ข๐ ๐ง๐ž๐ ๐š๐ซ๐จ๐ฎ๐ง๐ ๐š๐ง ๐š๐ข๐ซ ๐ฌ๐จ๐ฎ๐ซ๐œ๐ž ๐ก๐ž๐š๐ญ ๐ฉ๐ฎ๐ฆ๐ฉ.

JG Woodcock Construction installed underfloor heating across 114.2mยฒ of ground floor in a new-build home in Bridgnorth.

Working from a full Ambiente design, the installation used:
๐Ÿ”ธNine circuits across seven rooms
๐Ÿ”ธ847m of AmbiFlexยฎ M16 pipe
๐Ÿ”ธAmbiCastellated Pro panels
๐Ÿ”ธA 9-port 413 Series stainless steel manifold
๐Ÿ”ธA 45ยฐC flow and 35ยฐC return temperature

Each circuit was designed around the room size, floor finish and required heat output, helping the complete system operate efficiently with the propertyโ€™s air source heat pump.

โ€œTheir design, support, and delivery of materials has been absolutely stunning.โ€
John Turner, JG Woodcock Construction

Read the full case study via the link in the comments.

๐–๐ก๐ฒ ๐ฌ๐ฎ๐ฆ๐ฆ๐ž๐ซ ๐ข๐ฌ ๐”๐…๐‡ ๐ฌ๐ž๐š๐ฌ๐จ๐งNobody is thinking much about heating right now.Which is exactly why some of the best retrofit u...
12/08/2026

๐–๐ก๐ฒ ๐ฌ๐ฎ๐ฆ๐ฆ๐ž๐ซ ๐ข๐ฌ ๐”๐…๐‡ ๐ฌ๐ž๐š๐ฌ๐จ๐ง
Nobody is thinking much about heating right now.
Which is exactly why some of the best retrofit underfloor heating projects start in summer.

If floors are already coming up as part of a renovation, it is often the easiest and most cost-effective time to introduce UFH. The heating is off, disruption is easier to manage and there is more time available for installation, screed curing and commissioning.

Leave the conversation until autumn and programmes get tighter just as demand for heating work starts to rise.

So, if you have a floor-up renovation on the books this summer, now is the time to discuss UFH with your customer.

Send us the plans and our design team can provide a complete system design, pipe layout and quotation.

Weโ€™ve also answered some of the most common trade questions around retrofit UFH in our latest guide.

๐Ÿ”— Link in the first comment.

Address

Heritage House, 1 Woodside Lane, Bell Bar
Hatfield
AL96DE

Opening Hours

Monday 7:30am - 5pm
Tuesday 7:30am - 5pm
Wednesday 7:30am - 5pm
Thursday 7:30am - 5pm
Friday 7:30am - 5pm

Telephone

+441707649118

Alerts

Be the first to know and let us send you an email when Ambiente Systems UK posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Ambiente Systems UK:

Shortcuts

Share