NJR Construction

NJR Construction NJR construction is a family run business specialising in extensions, refurbs and small developments

Give your stairs a makeover. New handrail, newel posts and banisters with understairs opened up for maximum storage.
17/11/2022

Give your stairs a makeover. New handrail, newel posts and banisters with understairs opened up for maximum storage.

Complete fit out from stud work to second fix and pitch roof on a new build in Southend... for all trades and building s...
12/10/2022

Complete fit out from stud work to second fix and pitch roof on a new build in Southend... for all trades and building services get in touch

Local single story extension and garage conversion. Everything from the ground up.... get in touch for a free quote.
11/10/2022

Local single story extension and garage conversion. Everything from the ground up.... get in touch for a free quote.

Loft conversion in full swing. Roof is on, 1st fix plumbing and electrics all done, stairs fitted and now moving in for ...
25/02/2022

Loft conversion in full swing. Roof is on, 1st fix plumbing and electrics all done, stairs fitted and now moving in for second fix and decoration.

Part of a loft conversion were are doing. We have also refurbished the kitchen/lounge downstairs with new tiles througho...
25/02/2022

Part of a loft conversion were are doing. We have also refurbished the kitchen/lounge downstairs with new tiles throughout, new rads fitted, decoration and a new kitchen

Another new build going up over at hullbridge. Truss roof and stud work complete. Boarding under way over there soon to ...
25/02/2022

Another new build going up over at hullbridge. Truss roof and stud work complete. Boarding under way over there soon to be second fixed. Working with parkview developments.

New build. 1st fix and roof all done, plasterboard going on and then we're into second fix and fit out.
25/02/2022

New build. 1st fix and roof all done, plasterboard going on and then we're into second fix and fit out.

New bathroom fitted. Tiles floor to ceiling. Ceiling skimmed and painted. All pipe work replaced and ran under floor so ...
02/01/2022

New bathroom fitted. Tiles floor to ceiling. Ceiling skimmed and painted. All pipe work replaced and ran under floor so there's no boxing in required.

New worktops and upstand fitted. New sink fitted and plumbed in.
02/01/2022

New worktops and upstand fitted. New sink fitted and plumbed in.

Bespoke cabinet made in alcove.
02/01/2022

Bespoke cabinet made in alcove.

Address

30 Hawkwell Chase
Hockley
SS54NH

Alerts

Be the first to know and let us send you an email when NJR Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to NJR Construction:

Share

Category