BJW Joinery

BJW Joinery New joinery business starting up with work undertaken from doors, skirting, architrave etc.

21/11/2025

Before> After
5 fire doors re hung
New architrave, skirting and door stops
Caulked, filled and prepped by me ready to sand and paint

New laminate worktops installed with a masons mitre. Cut out for the sink space and sealed up all around
30/09/2025

New laminate worktops installed with a masons mitre. Cut out for the sink space and sealed up all around

Old damaged front door removed and installed a new door and frame. Trims installed and sealed up.
16/08/2025

Old damaged front door removed and installed a new door and frame. Trims installed and sealed up.

Flooring continued into the hallway. Along with all skirting complete in numerous areas.
02/03/2025

Flooring continued into the hallway. Along with all skirting complete in numerous areas.

With the project I’ve been working on coming to an end here’s an example of some of the work I’ve been doing Walls latte...
10/02/2024

With the project I’ve been working on coming to an end here’s an example of some of the work I’ve been doing

Walls latted out
Walls boarded with insulated plaster boards
Steel built out and fireboarded
Unilin insulation inbetween the rafters
Ceiling then boarded with insulated plasterboards
All finished and then plastered (not by myself)

26/11/2023

Handles, latches and keeps fitted in a full house on these nice oak veneered doors

Metal staircase where I have fit new risers ready for it all to be carpeted and decorated
21/11/2023

Metal staircase where I have fit new risers ready for it all to be carpeted and decorated

Big floor transformation on this job here. Old joists that needed replacing on this floor here. New joists and noggins i...
25/09/2023

Big floor transformation on this job here. Old joists that needed replacing on this floor here. New joists and noggins installed so that when the new 25mm plywood went down it levelled through with the rest of the floor. Finished off by getting boarded over with extra ply to then have vinyl flooring laid.

Solid Oak veneer door making a massive difference in this house🚪
20/07/2023

Solid Oak veneer door making a massive difference in this house🚪

Full MF suspended ceiling⬇️Perimeter laser levelled and fixedCross sections cut to size and clipped on to each other Han...
17/07/2023

Full MF suspended ceiling⬇️
Perimeter laser levelled and fixed
Cross sections cut to size and clipped on to each other
Hangars screwed to the metal and fixed through the joists to make solid and level
Fully rockwool insulated
Double plasterboarded and cables cut out to finish

One of the best feelings seeing big open rooms turned into living spaces when studwork is built🪵
24/06/2023

One of the best feelings seeing big open rooms turned into living spaces when studwork is built🪵

Address

23 East Avenue, Wakefield
Horbury
WF45JT

Website

Alerts

Be the first to know and let us send you an email when BJW Joinery posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to BJW Joinery:

Share

Category