DPS Electrical has successfully completed the electrical work at the Camden goods yard site for Watkins MEP. This six month project was a lovely job The scope of our work included:
* Mains distribution panels plus containment
* termination of cables for a 1000kva diesel transformer with automatic changeover switch with quadruple 240mm cables terminated into the panel that supplies 4 core blocks of emergency power
* Tri-rated 300s treble supplies terminated into the generator panel
* Provision for 25x ATS panels
Supporting sprinkler systems and fire alarm systems/aov/ lift supplies roof top mechanical plant
*mechanical plant room distribution boards plus small power and lighting.rooftop LED signage/lettering