Ewan Skinner LTD. Groundwork & Operated Plant Hire. Inverness

Ewan Skinner LTD. Groundwork & Operated Plant Hire. Inverness Plant Hire With Fully Qualified Operator's. Based in Inverness. All types of groundworks considered Ewan Skinner LTD Plant Hire With Fully Qualified Operator's.

Based in Inverness.Plant & Operator Hire for landscaping large & small areas, path, driveway & road construction, removing tree stumps, ditching, foundation and trenching and farm work. We also have a range of smaller plant to assist in garden work. Excavation & construction of shed bases, holes dug for tree planting, stripping gardens & preparing areas for planting. With a variety of different si

zed machines and fully qualified operators. All types of ground work considered. For a free, fast and friendly, quote please call 07921705669, Please "like" and share my page. Thanks for looking.

First stage of work completed at Maxwell Park. Car park regraded and lengthened with new materials added. New culvert fi...
16/02/2024

First stage of work completed at Maxwell Park. Car park regraded and lengthened with new materials added. New culvert fitted to divert the running water from the path. Trees felled and shredded. New bridge fitted. Path cleaned removing the over growth and new handrails fitted to the steps.
The drainage issues has been identified and passed on to the council.
Great work by the guys in somewhat very wet conditions.

Good morning folks. The path going through Maxwell park in Cradlehall will be closed on Friday the 9th of February and S...
03/02/2024

Good morning folks.
The path going through Maxwell park in Cradlehall will be closed on Friday the 9th of February and Saturday the 10th of February to allow the foot bridge at the top of the path to be replaced and carry out an investigation into the drainage issues. Also some tree felling is to take place in the area.
Ongoing work on Monday the 12th and Tuesday the 13th will continue in the area.
Please note the car park at the top of the park will be closed during this time.
We plan to wait for the school to go in on Friday the 9th of February before dismantling the current bridge and will do our best to keep distribution to a minimum.
All the best.
Ewan & Co

24/12/2023

Merry Christmas everyone. I hope Santa is good to you all.
We have had an amazing year, and I would like to thank all our customers past and present for your continued support.
Also, a big thank you to all the contractors we work with. Without each other, we would never have achieved what we have done.
Merry Christmas and all the best for 2024.
Ewan & Co πŸ™‚

21/12/2023
The 2023 Christmas Digger. πŸ™‚
21/12/2023

The 2023 Christmas Digger. πŸ™‚

A few pictures of work we have been involved in recently.
21/12/2023

A few pictures of work we have been involved in recently.

Groundwork in the recent weather can be an absolute nightmare. A few pictures of a path refurbished by the team over the...
10/10/2023

Groundwork in the recent weather can be an absolute nightmare. A few pictures of a path refurbished by the team over the past few days. Great effort put in whether the sun was shining or it was chucking it down πŸ™‚

25/09/2023

Large boulder in what was a tidy foundation πŸ˜†

It's been a while since I posted some photos of work we have been doing. πŸ˜†Variety of work being carried out.
31/05/2023

It's been a while since I posted some photos of work we have been doing. πŸ˜†
Variety of work being carried out.

On the move for the first time in 2023.πŸ™‚
03/01/2023

On the move for the first time in 2023.πŸ™‚

Address

Inverness

Alerts

Be the first to know and let us send you an email when Ewan Skinner LTD. Groundwork & Operated Plant Hire. Inverness posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Ewan Skinner LTD. Groundwork & Operated Plant Hire. Inverness:

Share

Category