11/08/2024
Innovation plays a crucial role in our industry. Pre-lagged pipework can significantly reduce installation time in specific situations. While visually appealing shiny pipework is desirable, practical considerations such as budget constraints and tight timescales may not always allow for it. Our approach involves installing pre-lagged pipework, ensuring that hot and cold returns, flow, and return lines are securely fixed and pressure-tested up to 10 bar. By minimizing joints (potential points of failure) and conducting thorough testing, our clients can rest assured that they won’t encounter any surprises in the future.