Contractor specialising in Equestrian Construction & maintenance projects but also cover Sports, Landscape, Fencing, Drainage, Civils and Retaining wall sectors. We are fully insured and registered with Companies house: SC714571
Our staff are qualified to NVQ level 4 in construction site management and hold full CPCS certification and NVQ level 2 in plant operations.

30/08/2026

As winter starts to creep in on us, now has never been a better time to get prepared before the muddy conditions arrive.

The importance of drainage is often underestimated and when it come to the control of surface water run off…. We have you covered!

One of the biggest issues we see around stable blocks is a lack of connection of the rain water downpipes. Roof areas capture a huge amount of water and simply allowing this to discharge onto the soft ground around your stables, only leads to problems. We can reduce the risk of flooding and damage by installing designated systems that will channel the water away to suitable outlets whether to watercourses via silt traps or soakaways, we can cover them all.
We invest in the correct equipment to ensure drainage is installed accurately and consistently and each job is surveyed to ensure we achieve the best solution. No guess work, all calculated because we believe in a right first time approach.

Ground preparation is also an important factor in management and care of your facilities.
We can install hardstandings, track systems and access roads that will last the test of time.
In addition, we are also approved suppliers and installers of Group surface products such as HIT Top Clean Mats or HIT step mats. Great solutions for turnout areas, gateways or track ways.

If you are considering some improvements before winter arrives, get in touch the our team today!

19/08/2026

A new week…. Another new customer!

Tasked with bringing the finishing touches to our clients self-build arena, we supplied and fitted the new membrane, equestrian grade silica sand and Combi-Ride Pro advanced stabiliser fibres. Mother Nature even popped in to provide some much needed moisture to the process! 🌧️
Final finish completed using our ArenaMate Type 3 Leveller.

A huge thank you to Emma and Harry for chosing us! We hope you enjoy your new surface. 🐎

Combi Ride Ltd
ArenaMate
Jelka Group

On the move 💪
17/08/2026

On the move 💪

05/08/2026

Find your ideal system

02/08/2026

Sunday Tractoring 🚜💨



If any of our contacts can assist with earth moving equipment,water support,or even haulage services to get kit to site…...
24/07/2026

If any of our contacts can assist with earth moving equipment,water support,or even haulage services to get kit to site………this is now a major incident. 😢
Get in touch with Jamie Todd

24/07/2026

A return visit to another of our long standing customers this week…. Week 1 of around 3 to be exact.

Starting off with some changes to the turnout area which seen removal of some post and rail fencing, extension to the width of the area and a replacement section of post and rail installed, this time higher to prevent the horses from eating the yew trees.
Extended areas covered with type 1 and a whin dust blinding.

A few other sections of rails replaced and a new entrance cut through with ramp back down into the field which, when open, will allow the horses to move around between areas freely.
New entrance secured with slip rails which are a cost effective solution over timber gates and much easier replaced if needed.

Then it was on to the first 69m section of stock fence replacement.
The old fence was past its best and anything but secure, but we soon cleared it using our Wacker Neuson ET18 with selector grab attachment.
Once cleared, we coupled up the ET18 with our flail head to clear back the overgrowth and create some working space to install the new fence.

New strainers and intermediate posts installed using our Protech P30 Contractor Post Knocker attached to the Bobcat CTL. Once complete, we swapped over from the post knocker and broke out the Fast Fencer Monkey which made quick and light work running out and tensioning the stock net. Finished off with a top wire and rails to close off the ends where the different fences meet.

All in all a very productive first week 💪

16/07/2026

Our Lochwinnoch job complete…. And another not without its challenges!
From very restricted access, to overhead power lines, BT cables and low trees on the access route all the way down to another strangely graded sub base and damaged areas of membrane, this one had it all!

Typically, we would determine any grades or falls of the surface from the underlying stone base as in theory, when built, everything should be uniform. This one looked to have a dual grade but after calculations it was apparent that the formation was twisted thus we were unable to use the laser system to ensure accuracy. In addition, there were high spots created by ruts from the initial build, so the existing sand base was anything but uniform.
We exposed and repaired the membrane firstly.
A top up of sand was required so once imported we set about grading the surface the old school way, by excavator and regular depth checks to ensure 5 inches was being achieved.

Once complete, the surface was tracked in for consolidation before applying Combi Ride Ltd Dual stabilising fibres which were then mixed into the sand profile.

The final touches to restore surface uniformity were completed using our trusty ArenaMate leveller. 👌

All in all, things came good and although not our preferred way of doing so, it came good enough to look well and leave behind another happy customer!

Thank you to Andy and family for their valued business and kindness. We wish you all the best with your new surface.

Address

Milnathort
Kinross
KY139

Opening Hours

Monday 8am - 6pm
Tuesday 8am - 6pm
Wednesday 8am - 6pm
Thursday 8am - 6pm
Friday 8am - 6pm

Alerts

Be the first to know and let us send you an email when Construction Management Solutions Fife Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Construction Management Solutions Fife Ltd:

Shortcuts

Share

Category