23/06/2026
60x30 steel frame building 4.2m to eves erected near Falmouth, this building features a 4 ft additional over hang to front, along with all steel work for workshop segregation at some point in the future.
Galvanised frame, 9x3 purlins, 7x3 side rails.
6x1 boarding to 3 sides.
Fibre cement roofing.
Deep flow guttering
Feel free to contact for a price
Www.bjrbuildingservices.co.uk