ttconstruction

ttconstruction *General Building Work
*Brickwork / Repointing
*Alterations
*Extensions
*Fully Insured
*Patios

Extension started this week conservatory down footings dug and concrete poured ready to start laying some bricks tomorro...
21/05/2026

Extension started this week conservatory down footings dug and concrete poured ready to start laying some bricks tomorrow

A nice fencing job we completed last week amazing how changing a fence can change the whole appearance of the house and ...
21/05/2026

A nice fencing job we completed last week amazing how changing a fence can change the whole appearance of the house and garden

Haven’t posted in a while but this one’s worth a post some transformation here! Lovely new garden ready for the summer ☀...
11/05/2026

Haven’t posted in a while but this one’s worth a post some transformation here! Lovely new garden ready for the summer ☀️ some before and afters!

A small roof we repaired due to getting a lot of water in through the damaged lead and ripped felt, We striped off the e...
01/03/2026

A small roof we repaired due to getting a lot of water in through the damaged lead and ripped felt, We striped off the existing back to the trusses put down new felt and battens and retiled using the existing tiles. We removed the damaged lead step flashing and installed new! Re done all the cement work on the verge and replace all the ridges with new and secured these using a dry ridge kit looks the same as before except it’s now fully water tight!

A nice little porcelain patio we have completed in the last couple of weeks whist the extension has other trades in comp...
01/03/2026

A nice little porcelain patio we have completed in the last couple of weeks whist the extension has other trades in completing there bits big change for the customers with a nice new area they can now use when we finally get some decent weather

Ceilings insulated and Fully plaster boarded ready for the big skim
01/03/2026

Ceilings insulated and Fully plaster boarded ready for the big skim

Busy start to the year getting the steel’s in and removing the internal walls so we could get ready for all the first fi...
01/03/2026

Busy start to the year getting the steel’s in and removing the internal walls so we could get ready for all the first fixing before plaster boarding

Getting the Windows and doors in on the extension makes a huge difference
01/03/2026

Getting the Windows and doors in on the extension makes a huge difference

Roofs are taking shape and it’s nice to see it without  the scaffold around it now just the back lower roof to complete ...
11/12/2025

Roofs are taking shape and it’s nice to see it without the scaffold around it now just the back lower roof to complete next week along with getting some windows and doors in then a big site tidy ready for steels and internal work in the new year

Not posted in a while but the extension is moving along nicely! Can’t wait to get this tiled and windows and doors in du...
23/11/2025

Not posted in a while but the extension is moving along nicely! Can’t wait to get this tiled and windows and doors in during the next few weeks!
Currently taking bookings from April onwards in 2026 if anyone is after any building work please feel free to get in contact with us for a free quotation 😁

Address

Whitnash
Leamington Spa
CV31

Website

Alerts

Be the first to know and let us send you an email when ttconstruction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share