09/06/2026
197 metres of Metropolitan Fan-Assisted Trench Heating across three floors installed at a brand new sixth form centre in Berkhamsted, Hertfordshire.
The system was engineered for low-temperature hot water operation (40/35Β°C for heating, 15/19Β°C for cooling), with a mix of 2-pipe and 4-pipe configurations tailored to each space. Linear brushed stainless steel grilles with polished aluminium trim throughout.
Delivered in collaboration with Elementa Consulting, H&E Engineers Ltd, and main contractor Beard Construction.
Full project write-up on the website - www.spc-hvac.co.uk