24/10/2026
External works are taking shape on Plot One at The Meadows in Leasingham.
At the front, preparations are beginning for the entrance pillars, gates, driveway and block paved areas.
Around the back, the team has started laying Indian sandstone slabs outside the kitchen and living area, creating a patio accessed through the new doors.